Developers and designers each had four tickets in progress at the same time - and by “in progress,” I mean actually in progress: including tickets in review and tickets in testing.
That’s a direct violation of one of the most basic Kanban principles: limit work in progress.
The symptom is always the same. The board looks busy. Nothing ships. Everyone is “almost done” with something. Standups turn into a list of things waiting on someone else.